SA

Substation Physical Project Designer - Grid

The Gap, Chicago
On-site
Full-time
No salary posted2 days ago
Employment type
Full-time · On-site
Posted
November 12, 2026

Hiring confidence: Sparse posting · 22/100

This posting is missing most of the signals we look for, or shows patterns common to listings that are not actively being filled. Check with the employer before applying. How this is scored

Job Overview

This is only part of this posting — the job board it came from publishes a short summary. Read the full posting.
WORK LOCATION: This position is based on a hybrid work schedule and will require in-office work 3 days per week at the Sargent & Lundy office. As a Substation Physical Project Designer, you will be working in a project team environment with engineers and other designers involved in high and extra high voltage substation design. Responsibilities will include the preparation and detailed review of the following substation drawings: Substation General Arrangement Substation Electrical Equipment Pl…

This role is based in The Gap, Chicago. Sargent Lundy is hiring for this full-time position through Jobily, where you can check how well your resume matches the posting before you apply.

About the Company

SA

Sargent Lundy