CR
Senior Electrical Designer / Engineer
Phoenix, Maricopa County
On-site
Full-time
No salary posted4 days ago- Employment type
- Full-time · On-site
- Posted
- November 9, 2026
Hiring confidence: Sparse posting · 22/100
This posting is missing most of the signals we look for, or shows patterns common to listings that are not actively being filled. Check with the employer before applying. How this is scored
Job Overview
This is only part of this posting — the job board it came from publishes a short summary. Read the full posting.
Job Description Job Description About our Company: Our client is an Arizona-based consulting engineering firm providing mechanical, electrical, process piping, and I&C engineering services for complex facilities throughout Arizona and neighboring states. For 30 years, our client has supported industrial, high-tech, semiconductor, healthcare, and other technically demanding facilities. Our mechanical work includes HVAC, exhaust, plumbing, process piping, utility systems, equipment installations,…
This role is based in Phoenix, Maricopa County. Critical Path Consultants, Inc. is hiring for this full-time position through Jobily, where you can check how well your resume matches the posting before you apply.
About the Company
CR